ANNEX 1
Project implementation capability (80 points)
Evaluation
item
Viewpoint
of confirmation
Steady
implementation of
the project
Project
performance
Has experience in the installation, maintenance
and operation of offshore wind power generation
facilities, or has experience in the installation,
maintenance and operation of onshore wind
power generation facilities and marine civil engineering work
Feasibility of the
business plan
Specificity, feasibility, and reliability of schedules,
plans for the marine renewable energy power
generation facilities, construction plans, maintenance and management plans, and income and
expenditure plans
Identification and
analysis of risks
Have the risks that may lead to business withdrawal been analyzed, and are responses possible?
• Risks related to construction (e.g., appropriate manufacturers, ships installed, presence or
absence of specific installation equipment,
Impact of infectious diseases on construction schedule, etc.)
Stable
supply
of electricity
Method of confirmation
•
Maintenance risks (technical impediments,
Impact of shortage of engineers due to infectious diseases, etc.)
•
Risks related to financial management (responses to fluctuations in wind conditions)
Appropriateness of financial plans (financial plans,
income and expenditure plans)
Confirm financial plans (financial plans, income
and expenditure plans), etc.
Are measures in place to restore power
quickly in the event of a failure, from the
viewpoint of ensuring a stable supply of
electricity?
•
Where are the parts manufactured, where
are they stored, and how are they supplied?
•
•
Are there facilities for repairs?
Whether early recovery is possible, particularly in
relation to the supply chain (whether plans have
been formulated for the formation of a domestic
supply chain with early recovery capabilities or
other supply chains equivalent thereto)
Submit a supply chain formation plan
describing measures for prompt procurement of parts in the event of a failure and for
strengthening of the supply chain.
•
Submit a supply chain formation plan including cost reduction measures
•
Is progress being made with state-of-theart technologies that can be introduced in
the future (assessed taking into account
its reliability, such as its performance and
verification results)?
Are there measures to reduce electricity prices in
the future? In particular, have supply chain formation plans, etc. been prepared that contribute to
price reductions?
Adoption of the latest technologies