Hogan Lovell OffshoreBook 2023 230809 OnlinePDF - Flipbook - Page 165
Offshore Wind Worldwide 2023
165
ANNEX 3
Evaluation Rating and Rating Methods
Example of
the
viewpoint of
confirmation
Scoring
Score ratio
Top Runner
Middle
Runner
Minimum
Requirement
Level that
cannot be said
to be inappropriate
Disqualification
100%
70%
30%
0%
-
Steady implementation of the project (65 points)
Having a track
record of
imple- mentation
30 points
Very appropriate results
(limited to
results based
on the natural
and social
conditions of
Japan, etc.)
(including
results overseas)
Excellent
Good
Other than as
shown on the
left
No results
The feasibility
of the business plan
20 points
Achieve
business
with utmost
certainty
Excellent
Good
Other than as
shown on the
left
Not commercially feasible
Appropriate
risk identification and
response
15 points
Very appropriate risk
analysis and
response
Excellent
Good
Other than as
shown on the
left
Not commercially feasible
Appropriateness of the
financial plan
No points
allocated
-
-
-
-
Not commercially feasible
Stable supply of electricity (15 points)
Stable supply
of electricity
and future
price reductions
10 points
Very appropriate
responses
from both
perspectives
One aspect is
quite appropriate and the
one viewpoint
aspect is
excellent
Good
Other than as
shown on the
left
-
Introduction
of the latest
technologies
5 points
First in the
world to
introduce
cutting-edge
technology
Progressing
with cuttingedge technologies that are
expected to
be introduced
in the future.
Introduction
of the most
advanced
technology
among general technologies
Other than as
shown on the
left
-