The project company must sign a PPA with
EVN, and the grid-connection agreement
with the power distribution company (if
connected to the power distribution system) or the power transmission company
Vietnam
(if connected to the power transmission
system) under EVN. The above permits are
generally binding from their issuance date
unless the permit provides for a different
effective date.